China galvanized sch 60 steel hollow pipe Manufacturer, Factories

Product Description

The Product Description

Product name Hot Dip Galvanized Steel Pipe
Wall Thickness 0.6mm--20mm
Length 1--14m According to customer requirements ...
Outer Diameter 1/2’’(21.3mm)---16’’(406.4mm)
Tolerance Tolerance based on Thickness: ±5~±8% ; According to customers requires .
Shape Round
Material Q195---Q345, 10#, 45#, S235JR, GR.B-D, STK500, BS1387......
Surface treatment Galvanized
Zinc coating Hot dip galvanized steel pipe : 220--350G/M2
Standard ASTM, DIN, JIS, BS
Certificate ISO, BV, CE, SGS
Payment terms 30% T/T deposit in advance, 70% balance after B/L copy; 100% Irrevocable L/C at sight, 100% Irrevocable L/C after receive B/L copy 20--30days
Delivery times 25 days after receive your deposits
Package
  1. Through a bundle
  2. According to customer’s requirement
Loading port Tianjin/Xingang

Product Detail

galvanized steel pipe thickness

Thickness

Length

Length

Diameter

Diameter

Frequently Asked Questions

Q1: What range of wall thickness and outer diameter do you offer for Hot Dip Galvanized Steel Pipes?

A1: We provide wall thicknesses ranging from 0.6mm to 20mm, and outer diameters from 1/2’’ (21.3mm) up to 16’’ (406.4mm) to suit various requirements.

Q2: What is the zinc coating weight on these pipes?

A2: Our hot dip galvanized steel pipes feature a high-quality zinc coating weight of 220 to 350 G/M2, ensuring excellent corrosion resistance.

Q3: Which materials and international standards do the pipes comply with?

A3: The pipes are manufactured according to ASTM, DIN, JIS, and BS standards. Available materials include Q195 to Q345, 10#, 45#, S235JR, GR.B-D, STK500, BS1387, and more.

Q4: What certifications do these galvanized steel pipes hold?

A4: Our manufacturing process and products are certified under international quality assurance standards including ISO, BV, CE, and SGS.

Q5: What are your shipping and payment terms?

A5: We accept 30% T/T deposit in advance with the remaining 70% balance after the B/L copy, or 100% Irrevocable L/C. The standard delivery time is 25 days after receiving the deposit, loaded via Tianjin/Xingang port.

Related Products